Solar · United States
BWC Wareham River
Operator BWC Wareham River, LLC
Operational1 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
BWC Wareham River is a 1 MW solar farm 11 km north-east of Marion, Plymouth County, Massachusetts, United States. It first operated in 2018. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 35 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when BWC Wareham River changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- BWC Wareham River, LLC
- Owner
- BWC Wareham River, LLC
- Location
- Plymouth County, Massachusetts, United States
- First operating
- 2018
- Balancing authority
- ISNE
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names BWC Wareham River. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has BWC Wareham River had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names BWC Wareham River; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of BWC Wareham River?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is BWC Wareham River?
- 11 km north-east of Marion, Plymouth County, Massachusetts, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).