Battery storage · United States

160 Tihonet Rd Hybrid(CSG)

Operator 160TIH WHAM8 Solar, LLC

Operational3.3 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

160 Tihonet Rd Hybrid(CSG) is a 3.3 MW battery storage site 11 km south of Carver, Plymouth County, Massachusetts, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 37 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 194 energy sites within 40 km for 160 Tihonet Rd Hybrid(CSG)

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (7 MWh)
Capacity
3.3 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
160TIH WHAM8 Solar, LLC
Owner
160TIH WHAM8 Solar, LLC
Location
Plymouth County, Massachusetts, United States
First operating
2021
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names 160 Tihonet Rd Hybrid(CSG). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has 160 Tihonet Rd Hybrid(CSG) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names 160 Tihonet Rd Hybrid(CSG); it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of 160 Tihonet Rd Hybrid(CSG)?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is 160 Tihonet Rd Hybrid(CSG)?
11 km south of Carver, Plymouth County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).