Burn of Whilk is a 22.5 MW wind farm 11 km south-west of Wick, Highland, United Kingdom. Its planning application (06/00676/FULCA.) went to Highland on 23 February 2007 and was granted on 30 March 2011. It has been operating since 7 August 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 30 other sites and 119 energy sites within 40 km for Burn of Whilk

Members see the sites and incidents around this one, and every record behind them.

7 Oct3 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 2,372 MWh, running 75% of half hours, peak 11 MW of 23, load factor 15%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £17,859 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
22.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
RWE npower
Location
Burn of WhilkHill of YarrowsCaithness, Highland, United Kingdom
Planning authority
Highland
Planning application
06/00676/FULCA.
First operating
2015
Turbines
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 06/00676/FULCA., with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 23 February 2007 Planning application submitted
  • 30 March 2011 Planning permission granted
  • 30 May 2014 Construction started
  • 7 August 2015 Operational

None found. The register holds no published incident that names Burn of Whilk. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burn of Whilk had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burn of Whilk; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Burn of Whilk?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 November 2015.
Where is Burn of Whilk?
11 km south-west of Wick, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).