Buckland Battery Storage

Operator REWE 5 Limited (Recurrent Energy and Windel Energy)

Application Refused150 MWData checked 16 November 2026Source record dated 4 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Buckland Battery Storage is a 150 MW battery storage site 4.3 km north-west of Weymouth, Dorset, United Kingdom. Its planning application (P/FUL/2024/04993) went to Dorset on 2 September 2024 and was refused on 18 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 29 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

179 energy sites within 40 km for Buckland Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
REWE 5 Limited (Recurrent Energy and Windel Energy)
Location
S/O Nottington Lane, Tatton, Weymouth, Dorset, DT3 4BU, United Kingdom
Planning authority
Dorset
Planning application
P/FUL/2024/04993

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/FUL/2024/04993, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 2 September 2024 Planning application submitted
  • 18 July 2025 Planning permission refused

None found. The register holds no published incident that names Buckland Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Buckland Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Buckland Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Buckland Battery Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2025.
Where is Buckland Battery Storage?
4.3 km north-west of Weymouth, Dorset, United Kingdom (postcode DT3 4BU).