Application Refused150 MWData checked 16 November 2026Source record dated 4 December 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Buckland Battery Storage is a 150 MW battery storage site 4.3 km north-west of Weymouth, Dorset, United Kingdom. Its planning application (P/FUL/2024/04993) went to Dorset on 2 September 2024 and was refused on 18 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 29 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Buckland Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 150 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- REWE 5 Limited (Recurrent Energy and Windel Energy)
- Location
- S/O Nottington Lane, Tatton, Weymouth, Dorset, DT3 4BU, United Kingdom
- Planning authority
- Dorset
- Planning application
- P/FUL/2024/04993
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/FUL/2024/04993, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 2 September 2024 Planning application submitted
- 18 July 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Buckland Battery Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Buckland Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Buckland Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Buckland Battery Storage?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2025.
- Where is Buckland Battery Storage?
- 4.3 km north-west of Weymouth, Dorset, United Kingdom (postcode DT3 4BU).