Onshore wind · United Kingdom
BROWNIELEYS - 3 WIND TURBINES
Operator Brownieleys Renewables/Muirden Energy
Operational7.5 MWData checked 16 November 2026Source record dated 28 February 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
BROWNIELEYS - 3 WIND TURBINES is a 7.5 MW wind farm 15 km north of Montrose, Grampian, United Kingdom. Its planning application (APP/2012/1121) went to Aberdeenshire on 13 April 2012 and was granted on appeal on 1 October 2013. It has been operating since 28 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when BROWNIELEYS - 3 WIND TURBINES changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
28 settled days to 4 Nov: 753 MWh, running 78% of half hours, peak 4 MW of 8, load factor 15%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £3,692 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 7.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Brownieleys Renewables/Muirden Energy
- Location
- Nw/O Brownieleys, Fordoun, Alford, Grampian, AB33 1JN, Grampian, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2012/1121
- First operating
- 2017
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2012/1121, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 13 April 2012 Planning application submitted
- 1 April 2013 Planning permission refused
- 1 October 2013 Planning permission granted
- 1 October 2013 Appeal granted
- 15 July 2016 Construction started
- 28 February 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names BROWNIELEYS - 3 WIND TURBINES. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has BROWNIELEYS - 3 WIND TURBINES had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names BROWNIELEYS - 3 WIND TURBINES; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of BROWNIELEYS - 3 WIND TURBINES?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 February 2017.
- Where is BROWNIELEYS - 3 WIND TURBINES?
- 15 km north of Montrose, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).