Around this site

← Back to Pernambuco

Solar · Brazil

Brígida Solar Plant

Operational63 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Technology
Solar
Capacity
63 MW
Status
Operational (Operating)
Operator
Solatio Brasil Gestão de Projetos
Owner
Solatio Energia [100%]
Location
São José do Belmonte, Região Geográfica Intermediária de Serra Talhada, Pernambuco, Brazil
First operating
2021
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Brígida Solar Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.