Around this site

← Back to Minas Gerais

Solar · Brazil

Leo Silveira solar farm

Planned (permitted)1000 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leo Silveira solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
1000 MW
Status
Planned (permitted) (Pre-construction)
Operator
Solatio Brasil Gestão de Projetos
Owner
Solatio Energia [100%]
Location
Buritizeiro, Região Geográfica Intermediária de Montes Claros, Minas Gerais, Brazil
Phases in the tracker
20

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Leo Silveira solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.