Around this site

← Back to Minas Gerais

Solar · Brazil

Andorinhas solar farm

Planned (permitted)540 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Andorinhas solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
540 MW
Status
Planned (permitted) (Pre-construction)
Owner
Lightsource Andorinhas Geração de Energia Ltda
Location
Buritizeiro, Minas Gerais, Brazil
Phases in the tracker
11

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Andorinhas solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.