Solar · United Kingdom
Bourne Farm
Operator Farm Power Apollo
Operational2.4 MWData checked 16 November 2026Source record dated 24 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bourne Farm is a 2.4 MW solar farm 7.1 km north of Dorchester, Dorset, United Kingdom. Its planning application (1/D/13/001044) went to Dorset on 1 August 2013 and was granted on 14 October 2013. It has been operating since 15 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bourne Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 2.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Farm Power Apollo
- Location
- Field B8 at Bourne Farm, adjacent to the Bourne Park Industrial Estates, Dorset, United Kingdom
- Planning authority
- Dorset
- Planning application
- 1/D/13/001044
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1/D/13/001044, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 1 August 2013 Planning application submitted
- 14 October 2013 Planning permission granted
- 30 November 2014 Construction started
- 15 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bourne Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bourne Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bourne Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bourne Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 May 2016.
- Where is Bourne Farm?
- 7.1 km north of Dorchester, Dorset, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).