← Back to Nevada
Planning pack for this site, £295Other options

Solar · United States

Boulder Solar III LLC

Operator 174 Power Global Corp. · Owner Boulder Solar III LLC (70%), Komipo (30%)

Planned128 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Boulder Solar III LLC is a 128 MW solar farm 20 km south-west of Boulder City, Clark County, Nevada, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 23 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Boulder Solar III LLC sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-2010, Arrest reported after damage at Dry Lake Solar Plant near Las Vegas, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20102023Arrest reported after damage at Dry Lake Solar Plant near Las Vegas37 kmSignificant
EIR-04562025Vegetation fire at Beryl, Utah solar farm doused by fire crews256 kmMinor
EIR-12402018Solar system reported to have caught fire at an Amazon warehouse in Redlands283 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
128 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
174 Power Global Corp.
Owner
Boulder Solar III LLC (70%), Komipo (30%)
Location
Clark County, Nevada, United States
Expected
2027
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Boulder Solar III LLC. If you know of one, report it (confidential reports are anonymised).

Has Boulder Solar III LLC had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Boulder Solar III LLC; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Boulder Solar III LLC?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Boulder Solar III LLC?
20 km south-west of Boulder City, Clark County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).