← Back to Grand Est

Energy sites / France / Grand Est

Battery storage · France

BORALEX STOCKAGE

Operational2.2 MWChecked 6 October 2026

Technology
Battery storage (Stored energy 0 MWh)
Capacity
2.2 MW
Status
Operational (En service)
Location
Chervey, Aube, Grand Est, France
First operating
2018
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

  • 5 June 2018 Connected to the grid
  • 5 June 2018 Operational

None found. The register holds no published incident that names BORALEX STOCKAGE. If you know of one, report it (confidential reports are anonymised).

The register holds 4 incidents at battery storage sites in France, 4 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts.