Offshore wind · United Kingdom

Blyth Offshore Wind Farm Phase 2 Demonstrator Project

Operator EDF Energy Renewables

Awaiting Construction58.4 MWData checked 16 November 2026Source record dated 28 April 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blyth Offshore Wind Farm Phase 2 Demonstrator Project is a 58.4 MW offshore wind farm 9.8 km east of Newbiggin-by-the-Sea, United Kingdom. Its planning application went to Marine Management Organisation on 1 March 2012 and was granted on 9 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blyth Offshore Wind Farm Phase 2 Demonstrator Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0029, Second blade failure of 2024 at Dogger Bank A offshore wind farm, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm28 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm28 kmSignificant
EIR-17782018Engineer loses arm during repair at North Sea Siemens Gamesa turbine28 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
58.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Blyth & Newbiggin-by-the-sea, Blyth, Offshore, United Kingdom
Planning authority
Marine Management Organisation
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Marine Management Organisation · Alerts for applications and incidents near here

  • 1 March 2012 Planning application submitted
  • 9 September 2022 Planning permission granted

None found. The register holds no published incident that names Blyth Offshore Wind Farm Phase 2 Demonstrator Project. If you know of one, report it (confidential reports are anonymised).

Has Blyth Offshore Wind Farm Phase 2 Demonstrator Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blyth Offshore Wind Farm Phase 2 Demonstrator Project; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Blyth Offshore Wind Farm Phase 2 Demonstrator Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 April 2022.
Where is Blyth Offshore Wind Farm Phase 2 Demonstrator Project?
9.8 km east of Newbiggin-by-the-Sea, United Kingdom.