Status
Operational
Operator or applicant
Hainsford Energy
Location
Blyth Harbour, North Blyth, Cambois, Bedlington, Northumberland, Northumberland, United Kingdom
Planning authority
Northumberland
Planning application
07/00287/FULES
First operating
2012
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 6 July 2007 Planning application submitted
  • 21 July 2008 Planning permission granted
  • 1 June 2011 Construction started
  • 1 September 2012 Operational

None found. The register holds no published incident that names Blyth Harbour Wind Farm (re-power). If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.