Solar · United Kingdom
Blakenhall Park Solar Farm
Operator Mercer Farming
Operational1.8 MWData checked 16 November 2026Source record dated 14 March 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Blakenhall Park Solar Farm is a 1.8 MW solar farm 8.6 km south-west of Burton upon Trent, Staffordshire, United Kingdom. Its planning application (P/2015/00401) went to East Staffordshire on 1 April 2015 and was granted on 6 June 2015. It has been operating since 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Blakenhall Park Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Mercer Farming
- Location
- Blakenhall Park, Bar Lane, Barton Under Needwood, Burton-On-Trent, Staffordshire, Staffordshire, DE13 8AJ, United Kingdom
- Planning authority
- East Staffordshire
- Planning application
- P/2015/00401
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2015/00401, with what the planning evidence pack adds for this site.
Every application in East Staffordshire · Alerts for applications and incidents near here
Timeline
- 1 April 2015 Planning application submitted
- 6 June 2015 Planning permission granted
- 10 August 2015 Construction started
- 15 September 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Blakenhall Park Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Blakenhall Park Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blakenhall Park Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Blakenhall Park Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2016.
- Where is Blakenhall Park Solar Farm?
- 8.6 km south-west of Burton upon Trent, Staffordshire, United Kingdom (postcode DE13 8AJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).