Onshore wind · United Kingdom

Blackstone Edge

Operator Ventient (formerly Infinis)

Operational7.5 MWData checked 16 November 2026Source record dated 4 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blackstone Edge is a 7.5 MW wind farm 4.5 km south of Shepley, South Yorkshire, United Kingdom. Its planning application (2008/0171) went to Barnsley on 1 November 2006 and was granted on 26 May 2009. It has been operating since 1 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 722 energy sites within 40 km for Blackstone Edge

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
7.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Ventient (formerly Infinis)
Location
Blackstone Edge, Penistone, South Yorkshire, United Kingdom
Planning authority
Barnsley
Planning application
2008/0171
First operating
2013
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2008/0171, with what the planning evidence pack adds for this site.

Every application in Barnsley · Alerts for applications and incidents near here

  • 1 November 2006 Planning application submitted
  • 26 May 2009 Planning permission granted
  • 1 July 2012 Construction started
  • 1 March 2013 Operational

None found. The register holds no published incident that names Blackstone Edge. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blackstone Edge had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blackstone Edge; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Blackstone Edge?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2013.
Where is Blackstone Edge?
4.5 km south of Shepley, South Yorkshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).