Battery storage · Germany
BER_EUREF_BSP1
Operator AUDI
Operational1 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
BER_EUREF_BSP1 is a 1 MW battery storage site 6.2 km south-west of Berlin, Germany. It first operated in 2019. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 4 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.
Get an email when BER_EUREF_BSP1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Usable capacity 1.5 MWh, Lithium-Batterie)
- Capacity
- 1 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- AUDI
- Location
- Berlin, Berlin, Berlin, 10829, Germany
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 21 May 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names BER_EUREF_BSP1. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has BER_EUREF_BSP1 had a fire or other incident?
- None is on the register as of 11 November 2026. The register holds no published incident that names BER_EUREF_BSP1; it holds 17 incidents at battery storage sites in Germany.
- What is the status of BER_EUREF_BSP1?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is BER_EUREF_BSP1?
- 6.2 km south-west of Berlin, Germany (postcode 10829).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).