← Back to Somerset
Planning pack for this site, £295Other options

Solar · United Kingdom

Bellcombe Works, Brent Road - Solar Panels

Operator William Haley Eng. Limited

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 28 September 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bellcombe Works, Brent Road - Solar Panels is a 0.6 MW solar farm 4.9 km north-east of Burnham-on-Sea, Somerset, United Kingdom. Its planning application (24/22/00020) went to Somerset on 9 August 2022 and was granted on 15 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bellcombe Works, Brent Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 5.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea5.4 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels32 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol32 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
William Haley Eng. Limited
Location
Bellcombe Works, Brent Road, East Brent, Somerset, TA9 4DB, United Kingdom
Planning authority
Somerset
Planning application
24/22/00020

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/22/00020, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 9 August 2022 Planning application submitted
  • 15 September 2022 Planning permission granted
  • 27 September 2025 Planning permission expired

None found. The register holds no published incident that names Bellcombe Works, Brent Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Bellcombe Works, Brent Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bellcombe Works, Brent Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bellcombe Works, Brent Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 September 2022.
Where is Bellcombe Works, Brent Road - Solar Panels?
4.9 km north-east of Burnham-on-Sea, Somerset, United Kingdom (postcode TA9 4DB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).