Onshore wind · United Kingdom

Bedlinog Wind Farm

Operator Tegni Cymru

Application Withdrawn6 MWData checked 16 November 2026Source record dated 20 September 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bedlinog Wind Farm is a 6 MW wind farm 4.7 km east of Abercanaid, Mid Glamorgan, United Kingdom. Its planning application (11/1150/03) went to Merthyr Tydfil on 22 September 2011 and was withdrawn on 11 September 2013. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 36 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 371 energy sites within 40 km for Bedlinog Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Tegni Cymru
Location
LAND AT BEDLINOG FARM, BEDLINOG CF46 6SN, Mid Glamorgan, United Kingdom
Planning authority
Merthyr Tydfil
Planning application
11/1150/03
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/1150/03, with what the planning evidence pack adds for this site.

Every application in Merthyr Tydfil · Alerts for applications and incidents near here

  • 22 September 2011 Planning application submitted
  • 11 September 2013 Application withdrawn

None found. The register holds no published incident that names Bedlinog Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bedlinog Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bedlinog Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Bedlinog Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 20 September 2013.
Where is Bedlinog Wind Farm?
4.7 km east of Abercanaid, Mid Glamorgan, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).