← Back to Nevada

Solar · United States

Arrow Canyon Solar Hybrid

Operator Arrow Canyon Solar LLC

Operational200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Arrow Canyon Solar Hybrid is a 200 MW solar farm 34 km north-east of Sunrise Manor, Clark County, Nevada, United States. It first operated in 2023. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 11 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 37 energy sites within 40 km for Arrow Canyon Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Arrow Canyon Solar LLC
Owner
Arrow Canyon Solar LLC
Location
Clark County, Nevada, United States
First operating
2023
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Arrow Canyon Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Arrow Canyon Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arrow Canyon Solar Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Arrow Canyon Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Arrow Canyon Solar Hybrid?
34 km north-east of Sunrise Manor, Clark County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).