Battery storage · United States
Gemini Solar Hybrid
Operator Gemini Solar · Owner Solar Partners XI LLC
Operational380 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Gemini Solar Hybrid is a 380 MW battery storage site 33 km south-west of Moapa Valley, Clark County, Nevada, United States. It first operated in 2024. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 8 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.
Get an email when Gemini Solar Hybrid changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (380 MWh)
- Capacity
- 380 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- Gemini Solar
- Owner
- Solar Partners XI LLC
- Location
- Clark County, Nevada, United States
- First operating
- 2024
- Balancing authority
- NEVP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Gemini Solar Hybrid. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Gemini Solar Hybrid had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Gemini Solar Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
- What is the status of Gemini Solar Hybrid?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Gemini Solar Hybrid?
- 33 km south-west of Moapa Valley, Clark County, Nevada, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).