Solar · United Kingdom
Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels
Operator Arnold Clark Automobiles Limited · Owner Jagc Holdings
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 12 May 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels is a 0.3 MW solar farm on the edge of Basford, Stoke-on-Trent, Staffordshire, United Kingdom. Its planning application (26/00064/SOLAR) went to Newcastle-under-Lyme on 6 February 2026 and was granted on 31 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ARNOLD CLARK AUTOMOBILES LIMITED (SC036386), active, since 1961. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1546, Solar panel isolation switch overheats in roof fire at a house in Bucknall, 6.4 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 6.4 km | Minor |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 6.6 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 22 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Arnold Clark Automobiles Limited
- Owner
- Jagc Holdings
- Location
- Arnold Clark Automobiles Ltd Brymbo Road Chesterton, Staffordshire, ST5 9HX, United Kingdom
- Planning authority
- Newcastle-under-Lyme
- Planning application
- 26/00064/SOLAR
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 26/00064/SOLAR, with what the planning evidence pack adds for this site.
Every application in Newcastle-under-Lyme · Alerts for applications and incidents near here
Timeline
- 6 February 2026 Planning application submitted
- 31 March 2026 Planning permission granted
- 31 March 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
- Where is Arnold Clark Automobiles Limited, Brymbo Road - Solar Panels?
- On the edge of Basford, Stoke-on-Trent, Staffordshire, United Kingdom (postcode ST5 9HX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).