Planning pack for this site, £295Other options

Solar · United Kingdom

Arnold Clark, Bearing Drive - Solar panels

Operator Arnold Clark Automobiles Limited · Owner Jagc Holdings

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 10 December 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Arnold Clark, Bearing Drive - Solar panels is a 0.4 MW solar farm in Wednesfield, West Midlands, United Kingdom. Its planning application (24/00384/PAOTH) went to Wolverhampton on 4 April 2024 and was granted on 29 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 111 other energy sites within 10 km, 54 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ARNOLD CLARK AUTOMOBILES LIMITED (SC036386), active, since 1961. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arnold Clark, Bearing Drive - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college20 kmMinor
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon30 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Arnold Clark Automobiles Limited
Owner
Jagc Holdings
Location
Arnold Clark Unit 3A Brook Point Bearing Drive, West Midlands, WV11 3SZ, United Kingdom
Planning authority
Wolverhampton
Planning application
24/00384/PAOTH

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00384/PAOTH, with what the planning evidence pack adds for this site.

Every application in Wolverhampton · Alerts for applications and incidents near here

  • 4 April 2024 Planning application submitted
  • 29 April 2024 Planning permission granted

None found. The register holds no published incident that names Arnold Clark, Bearing Drive - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Arnold Clark, Bearing Drive - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arnold Clark, Bearing Drive - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arnold Clark, Bearing Drive - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2024.
Where is Arnold Clark, Bearing Drive - Solar panels?
In Wednesfield, West Midlands, United Kingdom (postcode WV11 3SZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).