Battery storage · United Kingdom

Turner Crescent (Noriker Power Staunch)

Operator Hazel Capital& Noriker Power · Owner Limejump Virtual 5 Limited

Operational20 MWData checked 16 November 2026Source record dated 9 May 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Turner Crescent (Noriker Power Staunch) is a 20 MW battery storage site on the edge of Basford, Stoke-on-Trent, Staffordshire, United Kingdom. Its planning application (16/00242/FUL) went to Newcastle-under-Lyme on 24 March 2016 and was granted on 19 May 2016. It has been operating since 15 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 43 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

308 energy sites within 40 km for Turner Crescent (Noriker Power Staunch)

Members see the sites and incidents around this one, and every record behind them.

LIMEJUMP VIRTUAL 5 LIMITED (10946257), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with fossil fuel plant)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hazel Capital& Noriker Power
Owner
Limejump Virtual 5 Limited
Location
Holditch House, Holditch Road, Chesterton, Staffordshire, ST5 9JQ, United Kingdom
Planning authority
Newcastle-under-Lyme
Planning application
16/00242/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/00242/FUL, with what the planning evidence pack adds for this site.

Every application in Newcastle-under-Lyme · Alerts for applications and incidents near here

  • 24 March 2016 Planning application submitted
  • 19 May 2016 Planning permission granted
  • 15 December 2016 Construction started
  • 15 March 2017 Operational

None found. The register holds no published incident that names Turner Crescent (Noriker Power Staunch). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Turner Crescent (Noriker Power Staunch) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Turner Crescent (Noriker Power Staunch); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Turner Crescent (Noriker Power Staunch)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2019.
Where is Turner Crescent (Noriker Power Staunch)?
On the edge of Basford, Stoke-on-Trent, Staffordshire, United Kingdom (postcode ST5 9JQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).