Solar · United Kingdom
Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels
Operator Arden Farms Owmby Limited
Application RefusedData checked 16 November 2026Source record dated 12 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels is a solar farm 8.4 km north-west of Dunholme, Lincolnshire, United Kingdom. Its planning application (WL/2025/0015) went to West Lindsey on 19 February 2025 and was refused on 16 April 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Arden Farms Owmby Limited
- Location
- Arden Farms Limited Office, Owmby Cliff Farm, Owmby Cliff Road, Lincolnshire, LN8 2AD, United Kingdom
- Planning authority
- West Lindsey
- Planning application
- WL/2025/0015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for WL/2025/0015, with what the planning evidence pack adds for this site.
Every application in West Lindsey · Alerts for applications and incidents near here
Timeline
- 19 February 2025 Planning application submitted
- 16 April 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
- Where is Arden Farms Limited Office, Owmby Cliff Farm - Solar Panels?
- 8.4 km north-west of Dunholme, Lincolnshire, United Kingdom (postcode LN8 2AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).