← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Tillbridge Solar Farm, Hemswell - Battery Storage

Operator Tillbridge Solar Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 14 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tillbridge Solar Farm, Hemswell - Battery Storage is a battery storage site 11 km east of Gainsborough, Lincolnshire, United Kingdom. Its planning application (EN010142) went to The Planning Inspectorate - National Infrastructure on 10 April 2024 and was granted on 14 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tillbridge Solar Farm, Hemswell - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 47 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells47 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool153 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire208 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Tillbridge Solar Limited
Location
Tillbridge Solar Farm, Hemswell, Lincolnshire, DN21 5UN, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010142

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010142, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 10 April 2024 Planning application submitted
  • 14 October 2025 Planning permission granted

None found. The register holds no published incident that names Tillbridge Solar Farm, Hemswell - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Tillbridge Solar Farm, Hemswell - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tillbridge Solar Farm, Hemswell - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tillbridge Solar Farm, Hemswell - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 October 2025.
Where is Tillbridge Solar Farm, Hemswell - Battery Storage?
11 km east of Gainsborough, Lincolnshire, United Kingdom (postcode DN21 5UN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).