Planning pack for this site, £295Other options

Solar · United Kingdom

Amgen Cymru Limited, Bryn Pica Waste - Solar Panels

Operator Rhondda Cynon Taff County Borough Council

Application Submitted0.3 MWData checked 16 November 2026Source record dated 9 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Amgen Cymru Limited, Bryn Pica Waste - Solar Panels is a 0.3 MW solar farm on the edge of Aberdare, Mid Glamorgan, United Kingdom. Its planning application (25/0398/FUL) went to Rhondda Cynon Taf on 8 April 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 31 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Amgen Cymru Limited, Bryn Pica Waste - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 65 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea65 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels68 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol68 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Rhondda Cynon Taff County Borough Council
Location
Amgen Cymru Limited, Bryn Pica Waste Disposal Site, Merthyr Road, Llwydcoed, Aberdare, Mid Glamorgan, CF44 0BX, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
25/0398/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/0398/FUL, with what the planning evidence pack adds for this site.

Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here

  • 8 April 2025 Planning application submitted

None found. The register holds no published incident that names Amgen Cymru Limited, Bryn Pica Waste - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Amgen Cymru Limited, Bryn Pica Waste - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Amgen Cymru Limited, Bryn Pica Waste - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Amgen Cymru Limited, Bryn Pica Waste - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2025.
Where is Amgen Cymru Limited, Bryn Pica Waste - Solar Panels?
On the edge of Aberdare, Mid Glamorgan, United Kingdom (postcode CF44 0BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).