Planning pack for this site, £295Other options

Battery storage · United Kingdom

Rhydycar Business Park - Battery Energy Storage Systems

Operator Welsh Assembly Government

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 3 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rhydycar Business Park - Battery Energy Storage Systems is a 0.4 MW battery storage site in Merthyr Tydfil, Mid Glamorgan, United Kingdom. Its planning application (P/26/0146) went to Merthyr Tydfil on 30 June 2026 and was granted on 3 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rhydycar Business Park - Battery Energy Storage Systems sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 100 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire100 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter112 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool187 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Welsh Assembly Government
Location
Welsh Assembly Government Rhydycar Business Park, Mid Glamorgan, CF48 1UZ, United Kingdom
Planning authority
Merthyr Tydfil
Planning application
P/26/0146

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/26/0146, with what the planning evidence pack adds for this site.

Every application in Merthyr Tydfil · Alerts for applications and incidents near here

  • 30 June 2026 Planning application submitted
  • 3 August 2026 Planning permission granted
  • 3 August 2031 Planning permission runs out

None found. The register holds no published incident that names Rhydycar Business Park - Battery Energy Storage Systems. If you know of one, report it (confidential reports are anonymised).

Has Rhydycar Business Park - Battery Energy Storage Systems had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rhydycar Business Park - Battery Energy Storage Systems; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rhydycar Business Park - Battery Energy Storage Systems?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2026.
Where is Rhydycar Business Park - Battery Energy Storage Systems?
In Merthyr Tydfil, Mid Glamorgan, United Kingdom (postcode CF48 1UZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).