Around this site

← Back to Cataluña

Solar · Spain

Almenara solar farm

Planned (permitted)50 MWChecked 8 October 2026Last changed in the dataset 12 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Almenara solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
50 MW
Status
Planned (permitted) (Pre-construction)
Owner
Ignis Energía SL; ib vogt gmbH
Location
El Pla de Santa Maria, Tarragona, Cataluña, Spain

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Almenara solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.