Solar · United Kingdom
Aldeby Landfill Site Solar Park
Operator Infinis Solar Developments Limited · Owner Infinis Solar Holdings Limited
Awaiting Construction7 MWData checked 16 November 2026Source record dated 14 March 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Aldeby Landfill Site Solar Park is a 7 MW solar farm 4.8 km north-east of Beccles, Suffolk, United Kingdom. Its planning application (FUL/2021/0015) went to South Norfolk on 7 July 2021 and was granted on 8 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Aldeby Landfill Site Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
INFINIS SOLAR DEVELOPMENTS LIMITED (12167687), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aldeby Landfill Site Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2745, Fire at school solar panel convertor in Lowestoft, 8.7 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2745 | 2021 | Fire at school solar panel convertor in Lowestoft | 8.7 km | Minor |
| EIR-2522 | 2021 | Lowestoft school evacuated after electrical fire involving solar panels | 8.7 km | Minor |
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 57 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Infinis Solar Developments Limited
- Owner
- Infinis Solar Holdings Limited
- Location
- Aldeby Landfill Site, Beccles, Suffolk, NR34, United Kingdom
- Planning authority
- South Norfolk
- Planning application
- FUL/2021/0015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for FUL/2021/0015, with what the planning evidence pack adds for this site.
Every application in South Norfolk · Alerts for applications and incidents near here
Timeline
- 7 July 2021 Planning application submitted
- 8 April 2022 Planning permission granted
- 8 April 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Aldeby Landfill Site Solar Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Aldeby Landfill Site Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Aldeby Landfill Site Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Aldeby Landfill Site Solar Park?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2022.
- Where is Aldeby Landfill Site Solar Park?
- 4.8 km north-east of Beccles, Suffolk, United Kingdom (postcode NR34).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).