← Back to Cleveland

Energy sites / United Kingdom / Cleveland

Solar · United Kingdom

Albert Road Rooftop Solar Panels

Operational0.2 MWChecked 6 October 2026Last changed in the dataset 12 September 2021

Technology
Solar
Capacity
0.2 MW
Status
Operational
Operator or applicant
Ministry of Justice
Location
Law Courts, Cleveland, TS1 2AS, United Kingdom
Planning authority
Middlesbrough
Planning application
20/0676/PNO
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 12 November 2020 Planning application submitted
  • 17 March 2021 Planning permission granted
  • 12 September 2021 Operational

None found. The register holds no published incident that names Albert Road Rooftop Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.