Onshore wind · United Kingdom
Advanced Manufacturing Research Centre
Operational2.6 MWData checked 16 November 2026Source record dated 28 July 2009
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Advanced Manufacturing Research Centre is a 2.6 MW wind farm 4.9 km south of Rotherham, South Yorkshire, United Kingdom. Its planning application went to Rotherham on 1 January 2007 and was granted on 1 June 2007. It has been operating since 20 January 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 92 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Advanced Manufacturing Research Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Satellite heat detections at this site
2 heat detections within 1.5 km of this site on NASA's fire satellites, 11 Nov 2026 to 15 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.
Source: NASA FIRMS (LANCE), VIIRS. Read each morning.
The site
- Technology
- Onshore wind
- Capacity
- 2.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Location
- Advanced Manufacturing ParkWallis WayCatcliffeRotherhamS60 5TZ, South Yorkshire, United Kingdom
- Planning authority
- Rotherham
- First operating
- 2009
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Rotherham · Alerts for applications and incidents near here
Timeline
- 1 January 2007 Planning application submitted
- 1 June 2007 Planning permission granted
- 20 January 2009 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Advanced Manufacturing Research Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Advanced Manufacturing Research Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Advanced Manufacturing Research Centre; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Advanced Manufacturing Research Centre?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2009.
- Where is Advanced Manufacturing Research Centre?
- 4.9 km south of Rotherham, South Yorkshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).