Solar · United Kingdom

Advanced Blade Building, Brunel Way - Solar Photovoltaics

Operator Rolls Royce Rotherham

Awaiting Construction0.8 MWData checked 16 November 2026Source record dated 19 November 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Advanced Blade Building, Brunel Way - Solar Photovoltaics is a 0.8 MW solar farm 5 km south of Rotherham, South Yorkshire, United Kingdom. Its planning application (RB2024/1349) went to Rotherham on 20 September 2024 and was granted on 12 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 92 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

3 heat detections within 1.5 km of this site on NASA's fire satellites, 11 Nov 2026 to 15 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.

Source: NASA FIRMS (LANCE), VIIRS. Read each morning.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Advanced Blade Building, Brunel Way - Solar Photovoltaics sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster27 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof48 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent63 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Rolls Royce Rotherham
Location
Advanced Blade Building Brunel Way Catcliffe, South Yorkshire, S60 5WG, United Kingdom
Planning authority
Rotherham
Planning application
RB2024/1349

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2024/1349, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 20 September 2024 Planning application submitted
  • 12 November 2024 Planning permission granted

None found. The register holds no published incident that names Advanced Blade Building, Brunel Way - Solar Photovoltaics. If you know of one, report it (confidential reports are anonymised).

Has Advanced Blade Building, Brunel Way - Solar Photovoltaics had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Advanced Blade Building, Brunel Way - Solar Photovoltaics; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Advanced Blade Building, Brunel Way - Solar Photovoltaics?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 November 2024.
Where is Advanced Blade Building, Brunel Way - Solar Photovoltaics?
5 km south of Rotherham, South Yorkshire, United Kingdom (postcode S60 5WG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).