Battery storage · United Kingdom

Adj New House Farm, Luzlow Lane - Battery Energy Storage

Operator YLEM (BESS) South Limited · Owner Root-Power (South) Limited

Application Refused99 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Adj New House Farm, Luzlow Lane - Battery Energy Storage is a 99 MW battery storage site 6.8 km north of Longton, Staffordshire, United Kingdom. Its planning application (SMD/2024/0568) went to Staffordshire Moorlands on 18 February 2025 and was refused on 12 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 58 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

305 energy sites within 40 km for Adj New House Farm, Luzlow Lane - Battery Energy Storage

Members see the sites and incidents around this one, and every record behind them.

ROOT-POWER (SOUTH) LIMITED (15287001), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
99 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
YLEM (BESS) South Limited
Owner
Root-Power (South) Limited
Location
Adjoining, New House Farm, Luzlow Lane, Bagnall, Staffordshire, ST9 9JZ, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2024/0568

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2024/0568, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 18 February 2025 Planning application submitted
  • 12 December 2025 Planning permission refused

None found. The register holds no published incident that names Adj New House Farm, Luzlow Lane - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Adj New House Farm, Luzlow Lane - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Adj New House Farm, Luzlow Lane - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Adj New House Farm, Luzlow Lane - Battery Energy Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is Adj New House Farm, Luzlow Lane - Battery Energy Storage?
6.8 km north of Longton, Staffordshire, United Kingdom (postcode ST9 9JZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).