Police confirmed that a fire developed at the Gżira substation in Triq Sir Patrick Stuart. Enemalta said a small fire started at about 1.00pm at a substation in a private apartments block. Civil Protection attended and the flames were extinguished shortly...
Enemalta
Named in a role in 4 records, between 2020 and 2024.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Enemalta? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Enemalta
A December 2022 report says the 98-kilometre Malta-Italy subsea interconnector, which links Malta to the European electricity grid in Sicily, was damaged in a storm by a vessel anchor in March. Enemalta has said electricity from the interconnector forms...
A fire broke out at the Enemalta substation in Mellieħa, Malta. Because the substation is located directly behind the Solana Hotel & Spa, staff and residents of the hotel were evacuated as a precaution. The fire damaged the low voltage panel, though the...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
Enemalta reported that an electricity outage in Malta was caused by a failure of the interconnector on the Sicily side. The Malta grid is linked to the European grid through Sicily. The extent of the outage, its duration, the number of customers affected and...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.