WWL Teaching Hospitals NHS Foundation, The Avenue - Solar Panels

Awaiting Construction0.7 MWApplication A/25/100130/14PDJSubmitted 18 December 2025Granted 17 February 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
A/25/100130/14PDJ
Planning authority
Wigan
County or area
Greater Manchester
Nation
England
Technology
Solar
Capacity
0.7 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Dalkia Energy Services Limited
Location
Wrightington, Wigan And Leigh Teaching Hospitals NHS Foundation Leigh Infirmary The Avenue, WN7 1HS
  • 18 December 2025 Planning application submitted
  • 17 February 2026 Planning permission granted
  • 17 February 2031 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 1.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school1.0 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent53 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall58 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near WN7 1HS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Wigan.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.