← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Thurrock

The Place Solar Farm

Application Refused23.2 MWApplication 14/01278/FULSubmitted 9 December 2014Refused 25 November 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/01278/FUL
Planning authority
Thurrock
County or area
Essex
Nation
England
Technology
Solar
Capacity
23.2 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Be Renewables
Location
The Gateway Academy, Marshfoot Road, Grays, RM16 4LU
  • 9 December 2014 Planning application submitted
  • 25 November 2016 Planning permission refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house19 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers25 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London26 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near RM16 4LU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Thurrock.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.