← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Blaby

Soars Lodge Farm, Foston Lane - Solar Farm

Awaiting Construction49.9 MWApplication 24/0734/FULSubmitted 23 October 2024Granted 20 March 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/0734/FUL
Planning authority
Blaby
County or area
Leicestershire
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Soars Solar Limited
Location
Soars Lodge Farm, Foston Lane, Foston, Leicester, LE8 5WP
  • 23 October 2024 Planning application submitted
  • 20 March 2026 Planning permission granted
  • 20 March 2029 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge11 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property13 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering31 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near LE8 5WP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Blaby.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.