← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Staffordshire Moorlands

New Buildings Solar Farm, Sandon Road - Solar Farm

Application Submitted40 MWApplication SMD/2025/0388Submitted 30 September 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
SMD/2025/0388
Planning authority
Staffordshire Moorlands
County or area
Staffordshire
Nation
England
Technology
Solar
Capacity
40 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
New Buildings Solar Farm Limited
Location
New Buildings Solar Farm, Sandon Road, Hilderstone, ST15 8SL
  • 30 September 2025 Planning application submitted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1546, Solar panel isolation switch overheats in roof fire at a house in Bucknall, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall12 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent17 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire29 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ST15 8SL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Staffordshire Moorlands.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.