← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · East Suffolk

Ness Point

RevisedApplication DC/20/3376/FULSubmitted 2 September 2020Granted 23 December 2020

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/20/3376/FUL
Planning authority
East Suffolk
County or area
Suffolk
Nation
England
Technology
Battery storage (Co-located with fossil fuel plant)
Status
Revised
Operator or applicant
Conrad Energy
Location
Land At Ness Point, Gas Works Road, Lowestoft, NR32 1UZ
  • 2 September 2020 Planning application submitted
  • 23 December 2020 Planning permission granted
  • 23 December 2023 Planning permission expired

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 144 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction144 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells206 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire266 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NR32 1UZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Suffolk.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.