Onshore wind · United Kingdom
Ness point Wind Turbine 1
Operator SLP Energy · Owner Energy Holdco Limited
Operational2.3 MWData checked 16 November 2026Source record dated 3 February 2010
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ness point Wind Turbine 1 is a 2.3 MW wind farm in Lowestoft, Suffolk, United Kingdom. Its planning application (W14512/1) went to East Suffolk on 31 October 2001 and was granted on 27 September 2002. It has been operating since 1 December 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Ness point Wind Turbine 1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SLP ENERGY (BRAYBROOKE) LIMITED (08852672), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 2.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- SLP Energy
- Owner
- Energy Holdco Limited
- Location
- Land off North Beach Industrial EstateOff Wilde StreetNesspointLowestoft, Suffolk, United Kingdom
- Planning authority
- East Suffolk
- Planning application
- W14512/1
- First operating
- 2004
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for W14512/1, with what the planning evidence pack adds for this site.
Every application in East Suffolk · Alerts for applications and incidents near here
Timeline
- 31 October 2001 Planning application submitted
- 27 September 2002 Planning permission granted
- 1 December 2004 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Ness point Wind Turbine 1. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ness point Wind Turbine 1 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ness point Wind Turbine 1; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Ness point Wind Turbine 1?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 February 2010.
- Where is Ness point Wind Turbine 1?
- In Lowestoft, Suffolk, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).