← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Herefordshire, County of

Manor Farm Solar Panels

Under Construction0.3 MWApplication P204244/FSubmitted 2 December 2020Granted 18 February 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P204244/F
Planning authority
Herefordshire, County of
County or area
Hereford and Worcester
Nation
England
Technology
Solar
Capacity
0.3 MW
Status
Under Construction
Operator or applicant
Manor Farm
Location
Manor Farm, HR6 9LE
  • 18 February 2012 Planning permission expired
  • 2 December 2020 Planning application submitted
  • 18 February 2021 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1551, Fire involving solar panels on a garage roof in Shropshire, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15512019Fire involving solar panels on a garage roof in Shropshire20 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire49 kmMinor
EIR-15502021Small fire involving solar panels at a property in Clun49 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near HR6 9LE is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Herefordshire, County of.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.