← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Monmouthshire

Manor Farm (Monmouthshire)

Operational10.5 MWApplication DC/2013/00006Submitted 7 January 2013Granted on appeal 24 October 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/2013/00006
Planning authority
Monmouthshire
County or area
Gwent
Nation
Wales
Technology
Solar
Capacity
10.5 MW
Status
Operational
Operator or applicant
3C Energy/Conergy
Location
Llanvapley, Monmouthshire
Appeal reference
APP/E6840/A/14/2212987
First operating
2016
  • 7 January 2013 Planning application submitted
  • 13 September 2013 Planning permission refused
  • 4 April 2014 Appeal lodged
  • 24 October 2014 Planning permission granted
  • 24 October 2014 Appeal granted
  • 18 April 2016 Construction started
  • 23 June 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 50 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels50 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol50 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol50 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Manor Farm (Monmouthshire) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Monmouthshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.