← Back to Gwent
Planning pack for this site, £295Other options

Solar · United Kingdom

Morrisons, Abergavenny - Roof Mounted Solar Array

Operator WM Morrisons Supermarkets Plc

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 6 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morrisons, Abergavenny - Roof Mounted Solar Array is a 0.2 MW solar farm in Abergavenny, Gwent, United Kingdom. Its planning application (DM/2021/01893) went to Monmouthshire on 26 November 2021 and was granted on 29 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons, Abergavenny - Roof Mounted Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 52 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels52 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol52 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol53 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
WM Morrisons Supermarkets Plc
Location
Park Road, Abergavenny, Gwent, NP7 5TP, United Kingdom
Planning authority
Monmouthshire
Planning application
DM/2021/01893

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/2021/01893, with what the planning evidence pack adds for this site.

Every application in Monmouthshire · Alerts for applications and incidents near here

  • 26 November 2021 Planning application submitted
  • 29 March 2022 Planning permission granted
  • 29 March 2027 Planning permission runs out

None found. The register holds no published incident that names Morrisons, Abergavenny - Roof Mounted Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Morrisons, Abergavenny - Roof Mounted Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons, Abergavenny - Roof Mounted Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morrisons, Abergavenny - Roof Mounted Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 January 2022.
Where is Morrisons, Abergavenny - Roof Mounted Solar Array?
In Abergavenny, Gwent, United Kingdom (postcode NP7 5TP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).