Llangennech Solar

Awaiting Construction29.9 MWApplication DNS/3213164Submitted 19 March 2020Granted 23 July 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DNS/3213164
Planning authority
Welsh Government (NSIP)
County or area
Carmarthenshire
Nation
Wales
Technology
Solar
Capacity
29.9 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Voltalia UK
Location
Land At Penderi, Blaenhiraeth, Llangennech, Llanelli, Dyfed, SA14 8PX
  • 19 March 2020 Planning application submitted
  • 23 July 2021 Planning permission granted
  • 23 July 2026 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 95 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea95 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels110 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol110 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SA14 8PX is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Welsh Government (NSIP).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.