← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · South Derbyshire

Land at Coton Park Colliery

Operational2.5 MWApplication 9/2014/1015Submitted 10 November 2014Granted 9 March 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
9/2014/1015
Planning authority
South Derbyshire
County or area
Derbyshire
Nation
England
Technology
Solar
Capacity
2.5 MW
Status
Operational
Operator or applicant
NESF (formerly Green Energy Networks)
Location
Land at Coton Park Colliery, Coton Park, Linton, Swadlincote, DE12 6R
First operating
2015
  • 10 November 2014 Planning application submitted
  • 9 March 2015 Planning permission granted
  • 1 December 2015 Construction started
  • 21 December 2015 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college36 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge39 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall47 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DE12 6R is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Derbyshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.