← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Bath and North East Somerset

King Edwards School, North Road - Solar Panels

Under Construction0.2 MWApplication 23/01547/SOLPASubmitted 26 April 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/01547/SOLPA
Planning authority
Bath and North East Somerset
County or area
Somerset
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Under Construction
Operator or applicant
King Edwards School
Location
King Edwards School, North Road, Bathwick, Bath, BA2 6HU
  • 26 April 2023 Planning application submitted
  • 1 July 2023 Construction started

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2065, Loft fire believed caused by a solar panel at Paintworks flats in Bristol, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol17 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels18 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol18 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BA2 6HU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bath and North East Somerset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.