Planning application · Solar · Stroud

Hillhouse Farm

Operational28.5 MWApplication S.14/1800/FULSubmitted 5 August 2014Granted 8 December 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S.14/1800/FUL
Planning authority
Stroud
County or area
Gloucestershire
Nation
England
Technology
Solar
Capacity
28.5 MW
Status
Operational
Operator or applicant
Cambridge Solar Power/ Vogt Solar
Location
Hillhouse Farm Bristol Road, Cambridge, Gloucester, Gloucestershire, GL2 7AN
First operating
2015
  • 5 August 2014 Planning application submitted
  • 8 December 2014 Planning permission granted
  • 1 January 2015 Construction started
  • 31 March 2015 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries25 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire30 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol36 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GL2 7AN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stroud.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.