Guilford Europe, Cotes Park Lane - Solar Panels

Awaiting Construction2.4 MWApplication AVA/2022/0894Submitted 9 January 2023Granted 4 April 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
AVA/2022/0894
Planning authority
Amber Valley
County or area
Derbyshire
Nation
England
Technology
Solar
Capacity
2.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Alight AB
Location
Guilford Europe Limited, Cotes Park Lane, Somercotes, Alfreton, DE55 4NJ
  • 9 January 2023 Planning application submitted
  • 4 April 2023 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 40 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby40 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster50 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall53 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DE55 4NJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Amber Valley.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.