← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Gloucester

Francis And Lewis International, Waterwells Drive - Solar Panels

Awaiting Construction0.2 MWApplication 22/00851/SOLARSubmitted 31 August 2022Granted 7 November 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/00851/SOLAR
Planning authority
Gloucester
County or area
Gloucestershire
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
FLI Structures
Location
Francis And Lewis International Waterwells Drive, GL2 2AA
  • 31 August 2022 Planning application submitted
  • 7 November 2022 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries23 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire26 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol46 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GL2 2AA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Gloucester.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.