Planning application · Onshore wind · Cumberland

Fleeter Wood Wind Farm

Abandoned10 MWApplication 2/2007/1271Submitted 17 December 2007Granted 29 January 2009

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2/2007/1271
Planning authority
Cumberland
County or area
Cumbria
Nation
England
Technology
Onshore wind
Capacity
10 MW
Status
Abandoned
Operator or applicant
Novera Energy
Location
Fleeter Wood, Land adjacent to West House, Dearham, Maryport, Cumbria, CA15 7LD
Turbines
5
  • 17 December 2007 Planning application submitted
  • 29 January 2009 Planning permission granted
  • 29 January 2017 Planning permission expired

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 98 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire98 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm104 kmMajor
EIR-16242026Crane topples on Scout Moor wind farm project108 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Fleeter Wood Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.